Harrogate Convention Centre

Find Out More

Project Details

Client

Harrogate Convention Centre - www.harrogateconventioncentre.co.uk

Services

Resin Flooring

Project Scope

Harrogate Convention Centre asked MJF Group to install a new flooring system in their kitchen area, as the existing kitchen flooring was outworn, unsafe and dull.

We recommended a transition from vinyl to resin flooring - a modern, hygienic, anti-slip kitchen floor solution. This involved the uplift of vinyl and removal of drainage and the supply and installation of a new resin flooring system.

The Solution

We prepared the existing floor, fitted upgraded drainage, and installed the new resin flooring using 170m2 of Flowcrete’s Isopol SBR screed to falls followed by Flowfresh HF LT in mid-grey with cove detail.

 

 

Testimonial

“We got MJF Group to lay the new resin floor in our main kitchens at Harrogate Convention Centre. Due to the busy nature of our business, we needed downtime to be kept to an absolute minimum. MJF Group came and did a fantastic job in good time. We were soon back up and running with a really good-looking, hard-wearing new floor.”

Simon Wilkinson, General Manager, CH&CO